Project PlanningAdvanced Non-LWR

Project Tetra

πŸ“ TXDeveloper: Terrestrial EnergyVendor / Tech: Terrestrial Energy
Capacity
392 MW
Expected Operation
2026
Reactor Type
Molten Salt Reactor (IMSR)
Regulatory Status
DOE OTA signed Jan 2026 for Reactor Pilot Program; ground lease (β‰ˆ77 acres) and research agreements signed with Texas A&M System June 2026; site characterization (Zachry Nuclear engineering services) under way to support a future NRC construction permit application.

Details

Primary Use
Demonstration / industrial heat
Construction Start
2026

Research detail Β· verified 2026-10-10

Stage
Site and developer chosen
Commercial power
No (test, research, military or demonstration)
Key dates
2025 MOU with Texas A&M System (Energy Proving Ground); 2025-09-30 conditional pilot selection; 2026-01 OTA signed with DOE; 2026-06-23 ground lease and research agreements signed
Not verified / conflicts
Merged 10 Oct 2026 from two research rows (pilot and commercial plant) on the same lease. Capacity: ANS 2026-07-02 says 390 MWe; ANS 2026-06-23 says 392 MWe/882 MWt. Zachry agreement from search summary. Unclear whether Project TETRA pilot and the commercial IMSR plant are the same physical unit; no stated operation date found.