← Federal

Federal Agency Dockets

1,037 NRC / DOE / FERC rulemakings and notices

AgencyDocket NumberTitleStatusFiled
NRCNRC-2023-0207Applications for Amendments to Facility Operating Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Informationclosed2024-01-02
NRCNRC-2023-0215Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerationsclosed2023-12-26
NRCDocket No. 50-255Environmental Assessment and Finding of No Significant Impact; Holtec Decommissioning International, LLC, and Holtec Palisades, LLC, Palisades Nuclear Plantclosed2026-06-24
NRCNRC-2023-0083Information Collection: NRC Form 833, Form To Propose a Generic Issueclosed2024-07-19
NRCNRC-2023-0149Information Collection: Criteria and Procedures for Emergency Access to Non-Federal and Regional Low-Level Waste Disposal Facilitiesclosed2024-05-21
NRCNRC-2023-0216Draft Regulatory Guide: Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Production and Utilization Facilitiespending2024-04-25
NRCNRC-2023-0108Information Collection: NRC Form 149, OCFO Invitational Traveler Request Formclosed2024-04-03
NRCDocket No. 50-440-LREnergy Harbor Nuclear Corp.; Establishment of Atomic Safety and Licensing Boardclosed2023-12-11
NRCDocket Nos. 50-18, 50-70, 50-73, 50-183, 70-754, 70-1113, 70-1220, 72-1, 11001075, 11001076, 11005081, 11005086, 11005186, 11005555, and 11006278Indirect Transfers of Licenses; Order; In the Matter of General Electric Company, GE-Hitachi Nuclear Energy Americas, LLC, and Global Nuclear Fuel-Americas, LLCclosed2023-12-08
NRCDocket No. 030-30429Confirmatory Order; Issuance; In the Matter of ProTechnics Division of Core Laboratories LPclosed2023-12-08
NRCIA-23-013Order; Issuance; In the Matter of Magnus Quitmeyerclosed2023-12-08
NRCNRC-2023-0141Information Collection: Pre-Application Communication and Scheduling for Licensing Actions Related to Digital Instrumentation and Controlsclosed2024-04-17
NRCDocket No. 99902056Tennessee Valley Authority; Clinch River Nuclear Siteclosed2025-07-01
NRCNRC-2023-0195Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerationsclosed2023-11-28
NRC2023-26034712th Meeting of the Advisory Committee on Reactor Safeguards (ACRS)closed2023-11-27
NRCDocket No. 50-323Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Unit 2closed2023-11-22
NRCNRC-2023-0118Information Collection: Domestic Licensing of Special Nuclear Materialclosed2024-04-17
NRCNRC-2023-0102Information Collection: Comprehensive Decommissioning Program, Annual Site List and Point of Contactclosed2024-02-12
NRCNRC-2023-0144Miscellaneous Correctionsfinal rule2023-11-21
NRCNRC-2023-0166Draft Regulatory Guide: Dedication of Commercial-Grade Items for Use in Nuclear Power Plantspending2024-04-29
NRCNRC-2023-0167Draft Regulatory Guide: Evaluating Deviations and Reporting Defects and Noncompliancepending2024-03-26
NRCDocket No. 70-0398U.S. Department of Commerce; National Institute of Standards and Technologyclosed2025-04-23
NRCNRC-2015-0225Emergency Preparedness for Small Modular Reactors and Other New Technologiesfinal rule2023-11-16
NRCNRC-2022-0183Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Units 1 and 2; Correctionclosed2023-11-14
NRCNRC-2023-0056Information Collection: Notices, Instructions, and Reports to Workers: Inspection and Investigationsclosed2024-03-13
NRC2023-24919711th Meeting of the Advisory Committee on Reactor Safeguards (ACRS)closed2023-11-13
NRCDocket No. 50-302Accelerated Decommissioning Partners Crystal River Unit 3, LLC; Crystal River Unit 3 Nuclear Generating Plant; License Termination Planclosed2026-04-29
NRCDocket Nos. 50-18, 50-70, 50-73, 50-183, and 70-754Vallecitos Nuclear Center; Consideration of Approval of Transfer of Licenses and Conforming Amendmentsclosed2024-05-02
NRCNRC-2023-0187Regulatory Guide: Fire Protection for Nuclear Power Plantsfinal rule2023-11-08
NRCDocket No. 70-00143Nuclear Fuel Services, Inc.; U-Metal Projectclosed2023-11-06
NRCNRC-2023-0188Performance Review Boards for Senior Executive Serviceclosed2023-11-01
NRCDocket No. 70-1113Global Nuclear Fuel-Americas; Wilmington Nuclear Fuel Fabrication Facilityclosed2023-11-01
NRCNRC-2023-0183Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerationsclosed2023-10-31
NRCNRC-2023-0172Draft Regulatory Guide: Preemption Authority, Enhanced Weapons Authority, and Firearms Background Checkspending2024-04-24
NRCNRC-2022-0188List of Approved Spent Fuel Storage Casks: Holtec International HI-STORM 100 Cask System, Certificate of Compliance No. 1014, Renewed Amendment No. 17pending2023-12-14
NRCDocket No. 40-1162Split Rock, Wyoming Uranium Mill Tailings Radiation Control Act Title II Disposal Site; Jeffrey City, Wyomingclosed2023-11-15
NRCNRC-2023-0171Draft Regulatory Guide: Physical Security Event Notifications, Reports, and Recordspending2024-09-10
NRCNRC-2023-0173Draft Regulatory Guide: Suspicious Activity Reportspending2024-05-16
NRCNRC-2023-0101Information Collection: NRC Form 483, Registration Certificate-In Vitro Testing With Byproduct Material Under General Licenseclosed2024-03-21
NRCNRC-2018-0297Rubidium-82 Generators, Emerging Technologies, and Other Medical Use of Byproduct Material; Extension of Comment Periodpending2023-10-27
NRCDocket No. 030-02278Curators of the University of Missouri; South Farmclosed2023-10-27
NRCDocket No. 50-482Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating Station, Unit 1closed2025-09-26
NRCNRC-2019-0257Information Collection: Nondiscrimination in Federally Assisted Programs or Activities Receiving Assistance From the Commissionclosed2023-10-25
NRCNRC-2023-0181Proposed Revision to Standard Review Plan Branch Technical Position 7-19, Guidance for Evaluation of Defense In Depth and Diversity To Address Common-Cause Failure Due to Latent Design Defects in Digital Safety Systemsclosed2024-05-01
NRCNRC-2023-0145Draft Interim Staff Guidance: Radiological Survey and Dose Modeling of the Subsurface To Support License Terminationclosed2024-09-27
NRCNRC-2023-0130Increase in the Maximum Amount of Primary Nuclear Liability Insurancefinal rule2023-10-19
NRCNRC-2023-0153Draft Regulatory Guide: General Site Suitability Criteria for Nuclear Power Stationspending2024-02-29
NRC2023-22852Advisory Committee on the Medical Uses of Isotopes: Meeting Noticeclosed2023-10-17
NRCDocket Nos. 50-438 and 50-439Nuclear Development, LLC; Tennessee Valley Authority; Bellefonte Nuclear Plant, Units 1 and 2; Construction Permit Transfer Application; Withdrawal by Applicantclosed2023-10-13
NRC2023-22673710th Meeting of the Advisory Committee on Reactor Safeguards (ACRS)closed2023-10-13