TX·Bill·89th Legislature (2025)
HB 5590
Relating to a cost overage exemption for interconnection of advanced nuclear reactors to the ERCOT transmission system.
Introduced 2025-03-14Last action 2025-04-07 — Referred to State AffairsCommittee State Affairs
Sponsor
HarrisR
Cosponsors
None⚫
Died in House committee
The 89th Legislature (2025) ended on 2025-06-02. This bill was introduced when the session adjourned and did not advance to enactment.
Legislative Progress
✗
Introduced
2
In Committee
3
Passed Chamber
4
Enacted / Signed
Summary
This bill creates a special exemption for advanced nuclear reactors from certain transmission interconnection cost requirements in the ERCOT system (Texas's primary electric grid). Specifically, it exempts advanced nuclear reactors—defined as fission-based reactors in three size categories ranging from microreactors (less than 50 megawatts) to large reactors (600-1600 megawatts)—from having to pay costs that exceed the transmission-owning utility's allowance for connecting to the grid. While typically generation resources must directly pay for any interconnection costs above the utility's allowance, this bill removes that requirement for advanced nuclear facilities, potentially reducing a significant financial barrier to nuclear power development in Texas. The law would take effect September 1, 2025.
Bill history
- 2025-03-14 · HouseFiled
- 2025-04-07 · HouseRead first time
- 2025-04-07 · HouseReferred to State Affairs
Note
Historical import. Session: 89R
Full Bill Text
http://capitol.texas.gov/tlodocs/89R/billtext/pdf/HB05590I.PDF