US·Regulatory Docket·NRC

Docket No. 50-609

Closed

Northwest Medical Isotopes, LLC Medical Radioisotope Production Facility

Filed 2022-07-18Last update 2022-07-18

Summary

The U.S. Nuclear Regulatory Commission (NRC) is terminating the Northwest Medical Isotopes, LLC (NWMI) Medical Radioisotope Production Facility (RPF) construction permit (permit) designated as CPMIF-002. The permit authorized NWMI to construct the RPF in Columbia, Missouri. Construction was not initiated for the RPF, and nuclear materials were never procured or possessed under this permit. Consequently, the RPF site is approved for unrestricted use.