US·Regulatory Docket·NRC
NRC-2022-0079
Draft Interim Staff Guidance: Advanced Reactor Content of Application Project Chapter 12, “Post-Construction Inspection, Testing, and Analysis Program”
Filed 2024-04-03Last update 2023-05-25
Summary
The U.S. Nuclear Regulatory Commission (NRC) is soliciting public comment on its draft Interim Staff Guidance (ISG) DANU-ISG-2022- 06, Chapter 12, "Post-Construction Inspection, Testing, and Analysis Program." The purpose of this proposed ISG is to provide guidance to assist the NRC staff in determining whether an application for a non- light water reactor (non-LWR) design that uses the Licensing Modernization Project (LMP) process meets the minimum requirements for construction permits, operating licenses, manufacturing licenses, standard design approval, or design certifications.