OR·Bill·2025 Regular Session

SB 216

Died in Senate committee

Relating to nuclear-fueled thermal power plants.

Introduced 2025-01-13Last action 2025-06-27 — In committee upon adjournment.Committee Energy and Environment

Sponsor

Ed DiehlR

Cosponsors

Bruce Starr(R)
⚫
Died in Senate committee
The 2025 Regular Session ended on 2025-06-30. This bill was in committee when the session adjourned and did not advance to enactment.

Legislative Progress

✓
Introduced
✗
In Committee
3
Passed Chamber
4
Enacted / Signed

Summary

This bill removes two major regulatory barriers to building nuclear power plants in Oregon by repealing existing requirements that (1) a licensed repository for high-level radioactive waste disposal must exist before a nuclear plant can receive a site certificate, and (2) voters must approve any proposed nuclear power plant through a statewide election. By eliminating these prerequisites, the legislation would make it significantly easier to develop nuclear power facilities in Oregon, as developers would no longer need to wait for a federal waste repository solution or secure voter approval through a ballot measure. The bill maintains existing requirements for radioactive waste storage responsibilities and insurance coverage, but removes the primary obstacles that have effectively prevented new nuclear plant construction in the state.

Bill history

  1. 2025-01-13 · Senate
    Introduction and first reading. Referred to President's desk.
  2. 2025-01-17 · Senate
    Referred to Energy and Environment.
  3. 2025-03-05 · Senate
    Public Hearing held.
  4. 2025-03-10 · Senate
    Public Hearing held.
  5. 2025-06-27 · Senate
    In committee upon adjournment.

Note

Historical import. Session: 2025R1

Full Bill Text
https://olis.oregonlegislature.gov/liz/2025R1/Downloads/MeasureDocument/SB216/Introduced
View full text →