OR·Bill·2025 Regular Session
SB 215
Relating to nuclear-fueled thermal power plants; providing that this Act shall be referred to the people for their approval or rejection.
Introduced 2025-01-13Last action 2025-06-27 — In committee upon adjournment.Committee Energy and Environment
Sponsor
Ed DiehlR
Cosponsors
Bruce Starr(R)
⚫
Died in Senate committee
The 2025 Regular Session ended on 2025-06-30. This bill was in committee when the session adjourned and did not advance to enactment.
Legislative Progress
✓
Introduced
✗
In Committee
3
Passed Chamber
4
Enacted / Signed
Summary
This bill removes two major regulatory barriers to building nuclear power plants in Oregon by repealing the requirement that a licensed repository for high-level radioactive waste disposal must exist before a nuclear plant can receive a site certificate, and eliminating the requirement that proposed nuclear power plants must be approved by Oregon voters. The legislation essentially streamlines the approval process for nuclear power development in the state by removing both the waste disposal prerequisite and the mandatory voter referendum that currently make it extremely difficult to site new nuclear facilities. Since this represents a significant policy change regarding nuclear energy development, the bill itself will be referred to Oregon voters for approval or rejection at the next general election.
Bill history
- 2025-01-13 · SenateIntroduction and first reading. Referred to President's desk.
- 2025-01-17 · SenateReferred to Energy and Environment.
- 2025-03-05 · SenatePublic Hearing held.
- 2025-03-10 · SenatePublic Hearing held.
- 2025-06-27 · SenateIn committee upon adjournment.
Note
Historical import. Session: 2025R1
Full Bill Text
https://olis.oregonlegislature.gov/liz/2025R1/Downloads/MeasureDocument/SB215/Introduced