OR·Bill·2025 Regular Session

HB 3565

Died in House committee

Relating to small modular reactor energy facilities.

Introduced 2025-02-18Last action 2025-06-27 — In committee upon adjournment.Committee Climate, Energy, and Environment

Sponsor

Darcey EdwardsR

Cosponsors

None
⚫
Died in House committee
The 2025 Regular Session ended on 2025-06-30. This bill was in committee when the session adjourned and did not advance to enactment.

Legislative Progress

✓
Introduced
✗
In Committee
3
Passed Chamber
4
Enacted / Signed

Summary

This bill removes two major regulatory barriers for small modular reactor (SMR) nuclear facilities in Oregon, which are defined as advanced nuclear reactors with 300 megawatts or less capacity that can be factory-built and assembled on-site. Specifically, it exempts SMR facilities from existing Oregon laws that currently require: (1) the existence of a federally licensed repository for high-level radioactive waste disposal before any nuclear plant can be built, and (2) voter approval through a statewide ballot measure for any proposed nuclear facility. By eliminating these requirements that have effectively blocked nuclear development in Oregon since the 1980s, the bill would allow SMR facilities to proceed through the standard energy facility siting process without needing to first solve the federal nuclear waste storage issue or obtain direct voter consent.

Bill history

  1. 2025-02-18 · House
    First reading. Referred to Speaker's desk.
  2. 2025-02-20 · House
    Referred to Climate, Energy, and Environment.
  3. 2025-06-27 · House
    In committee upon adjournment.

Note

Historical import. Session: 2025R1

Full Bill Text
https://olis.oregonlegislature.gov/liz/2025R1/Downloads/MeasureDocument/HB3565/Introduced
View full text →