OK·Bill·2026 Regular Session
SB 131
Nuclear energy; establishing provisions relating to retirement and replacement of coal-fired electric generation facilities; authorizing construction of nuclear power plant by certain entities. Effective date.
Introduced 2025-02-03Last action 2025-02-19 — Placed on General OrderCommittee Energy
Sponsor
BolesR
Cosponsors
Brad Boles(R)
⚫
Died in Senate committee
The 2026 Regular Session ended on 2026-05-29. This bill was in committee when the session adjourned and did not advance to enactment.
Legislative Progress
✓
Introduced
✗
In Committee
3
Passed Chamber
4
Enacted / Signed
Summary
This bill establishes a regulatory framework for replacing retiring coal-fired power plants in Oklahoma, with a preference for nuclear or natural gas facilities. It requires electric utilities to notify the Corporation Commission before retiring any coal-fired plant and submit a cost study of replacement options, prioritizing advanced nuclear reactors or natural gas facilities as replacements unless they can justify an alternative choice. The bill authorizes entities to construct nuclear power plants in the state, provided they comply with federal Nuclear Regulatory Commission requirements and obtain approval from the Oklahoma Department of Environmental Quality, and mandates that any new nuclear facility must include on-site or nearby storage capacity for spent fuel within the same zip code area.
Bill history
- 2025-02-03 · SenateFirst Reading
- 2025-02-03 · SenateAuthored by Senator Burns
- 2025-02-04 · SenateSecond Reading referred to Energy
- 2025-02-10 · SenateCoauthored by Representative Boles (principal House author)
- 2025-02-13 · SenateReported Do Pass, amended by committee substitute Energy committee; CR filed
- 2025-02-19 · SenatePlaced on General Order
Note
Historical import. Session: 2026
Full Bill Text
https://www.oklegislature.gov/cf_pdf/2025-26%20FLR/SFLR/SB131%20SFLR.PDF