CA·Bill·2017-2018 Regular Session
AB 457
Saline water conversion: Diablo Canyon nuclear powerplant.
Introduced 2017-02-13Last action 2017-02-13
Sponsor
Cunningham
Cosponsors
None⚫
Died in Assembly committee
The 2017-2018 Regular Session ended on 2018-09-15. This bill was in committee when the session adjourned and did not advance to enactment.
Legislative Progress
✓
Introduced
✗
In Committee
3
Passed Chamber
4
Enacted / Signed
Summary
This bill requires the California Public Utilities Commission to commission an independent feasibility study on repurposing the existing water desalination facility at the Diablo Canyon nuclear power plant for local water supply use, as part of the plant's decommissioning process. The study aims to explore whether the desalination infrastructure currently used by the nuclear plant could be converted to provide desalinated water for local communities after the plant closes, with the goal of mitigating negative impacts to ratepayers. The commission must contract with a third party to conduct this study, which will be funded through the Public Utilities Commission Utilities Reimbursement Account rather than directly charging ratepayers.
Note
Historical import. Session: 20172018
Full Bill Text
https://leginfo.legislature.ca.gov/faces/billPdf.xhtml?bill_id=201720180AB457&version=20170AB45797AMD